Hi,
Doing a re-wire for a restaurant. The premises currently has 2 Hager RCD main switch board mounted next to each other between galv trunking.
One of the consumer units used to be on a day night meter, however is now permanently live.
Is there any problem in using the 2 boards as an alternative to installing a split load board?
Thanks