R
robertoj
Hi guys Im doing electrician course 2357 and I have problem Assignment 305 with some questions anyone can help me??? Waiting for reply Thanks!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss 2357 305 Task A,B in the Electrician Courses : Electrical Quals area at ElectriciansForums.net
hi for installation of the lighting circuit within the workshop,toilets,restroom That contains the conduit(pvc and metallic)
[FONT="] [/FONT] |
1.during installation of the main trunking system within Block L,various amounts of cutting and drilling through the building structure is required.Describe two ways in which the fabric and structural integrity of the building can be maintained?You need to come in with some answers Rob and we will comment.
Nobody is going to give you word for word stuff that you can copy and paste.
Lets have a post from you for each question and your thoughts on each.
Boydy
thank youYou would need to provide more detail than that, I think you are not trying too hard!
Minimising the size of penetrations , complying with Part A of the building regulations, resealing the fabric around penetrations are good starting points.
Correct design of the containment system to minimise sharp direction changes, proper preparation of the containment (filing down, sanding cut edges), ensuring smooth bends, ensuring an adequate number of draw points are installed, ensuring suitable support for the containment both on the surface to which it is affixed and for the method and frequency of supports would be a good ideas to expand on.
Reply to 2357 305 Task A,B in the Electrician Courses : Electrical Quals area at ElectriciansForums.net