Main reason for this is that you can tell how good the earth is upstream, and whether or not the install is relying on the downstream earth, as if it was it would be a failure

Not correct, there is only one earth source and that is at origin, all others are parallel earth paths, Ze is measured with earthing conductor disconnected so as to measure external only, otherwise it is not Ze
 
The owner has agreed that the whole installation may be isolated in order for tested to be carried out.There is a period of 1 hour allocated for this work.List the test that MUST be carried out during this period(individual circuits may be isolated after this period)

Ze and all "dead tests"; I guess!
 
Last edited:
If it's not a PIR, then it's an 'Initial Verification' and wouldn't be energised until the testing had been done anyway - so you wouldn't need the 'one hour' shutdown.

If the owner is allowing you one hour to shut the thing down, then it must be an existing installation, so PIR.

The only time the tests are required to be done in the stated order are during 'initial verification'.:)

Would this also apply to an addition or an alteration to a circuit that had been isolated at the C/U, but required an EIC to be completed?
Then the order of test would be as per section 1.2 of GN3 as there still needs to be @Initial verification' following this work too?

I am sitting this exam soon, so I just am exploring the subject and not trying to be funny in anyway :)

Martin
 
Last edited by a moderator:

Reply to 2391 exam question in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
299
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
807
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
853

Similar threads

  • Question
He is after the four options for 1 and 2 of the multiple choice exam, probably optimistic someone will know this. Your question 3 in incomplete to...
Replies
2
Views
1K
I don't think I'd use it mate even the one line heading then one long paragraph screams ai. And untrustworthy. I don't think much has been edited...
    • Optimistic
Replies
3
Views
931

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top