S
Somerset-UK
Good Morning Guys
We are building 3 x 1-bed flats in an old bar within our hotel.
Studwork has gone up and we are ready to first-fix electric cables etc.
Of course, our 2 prefered electricians have both vanished on a 2-week holiday so we are a little stuck.
Their advice was "you can run the cables and lighting and we will check, connect and sign-off when we get back".
That worked fine on a small reception area we had built but this new stuff is a LOT more complex - involving 3 new CU, coin meters and high power instant water heaters.
So, would anyone be able to offer some advice please - I have attached several photos.
There are some photos showing the 3-phase coming in - with two CU (the bottom is not used now). However, whilst the main 3-phase box can stay (it will be inside a cupboard within one of the flats), we need to move ALL of the CUs so we can access them without disturbing guests.
I'm unsure what size cables to run from where to where?
Should we put 3 sub mains next to the main 3-phase and then a CU next to the coin box? how does the coin box wire in?
OF COURSE - if any of you fully qualified chaps fancy the job, then kindly PM me. We are at TA8 near Sedgemoor Services M5
The issue I have is that we can run the cables very easily if we know where to run what - but I do need the connections and cert ASAP.
We are building 3 x 1-bed flats in an old bar within our hotel.
Studwork has gone up and we are ready to first-fix electric cables etc.
Of course, our 2 prefered electricians have both vanished on a 2-week holiday so we are a little stuck.
Their advice was "you can run the cables and lighting and we will check, connect and sign-off when we get back".
That worked fine on a small reception area we had built but this new stuff is a LOT more complex - involving 3 new CU, coin meters and high power instant water heaters.
So, would anyone be able to offer some advice please - I have attached several photos.
There are some photos showing the 3-phase coming in - with two CU (the bottom is not used now). However, whilst the main 3-phase box can stay (it will be inside a cupboard within one of the flats), we need to move ALL of the CUs so we can access them without disturbing guests.
I'm unsure what size cables to run from where to where?
Should we put 3 sub mains next to the main 3-phase and then a CU next to the coin box? how does the coin box wire in?
OF COURSE - if any of you fully qualified chaps fancy the job, then kindly PM me. We are at TA8 near Sedgemoor Services M5
The issue I have is that we can run the cables very easily if we know where to run what - but I do need the connections and cert ASAP.