Evening Guys,

A commercial customer of mine has asked me to price a manual and a programmable speed controller for an existing ventilation motor. At the moment the motor is started and stopped manually.

I have no expertise in this area so some advice would be greatly appreciated.

The motor is 3 phase and is 15kW.

Thanks
 
Is there an air handing unit with element filters or HEPA filters to remove the particulates/dust? If so usually you'd install a flow sensor (or pressure sensor) linked to a VFD so as the filters become higher resistance as they become blocked the fan speed is automatically increase to compensate for the higher static pressures thereby maintaining a constant air volume through the system.

Never heard of a extraction system that's speed controlled according to the electricity tariff price.... sounds like accountants are going off-piste into engineers territory to me.
 
Last edited:
Never heard of a extraction system that's speed controlled according to the electricity tariff price.... sounds like accountants are going off-piste into engineers territory to me.

You are just not with the times Marvo. There is nothing better than gassing your employees to save some money..... Get with the plan mate...
 
Never heard of a extraction system that's speed controlled according to the electricity tariff price.... sounds like accountants are going off-piste into engineers territory to me.

I had the same thoughts about peak times.
Somewhat related, my previous company ( I retired a few months ago) has an accountant negotiating maintenance contracts that have been in place for decades. And screwing them up from what I hear.

Previously, my very able PA took care of all of that and much more besides. She retired a bit over a year ago. Now they have no fewer than six people involved including the UK finance director and making an utter balls of it. It's a cast iron certainty that they will lose that business. Don't shaft the customers or they will vote with their feet.
 
Evening Guys,

A commercial customer of mine has asked me to price a manual and a programmable speed controller for an existing ventilation motor. At the moment the motor is started and stopped manually.

I have no expertise in this area so some advice would be greatly appreciated.

The motor is 3 phase and is 15kW.

Thanks

My advice would be to decline to quote, and suggest they contact a HVAC company.
 
I had the same thoughts about peak times.
Somewhat related, my previous company ( I retired a few months ago) has an accountant negotiating maintenance contracts that have been in place for decades. And screwing them up from what I hear.

Previously, my very able PA took care of all of that and much more besides. She retired a bit over a year ago. Now they have no fewer than six people involved including the UK finance director and making an utter balls of it. It's a cast iron certainty that they will lose that business. Don't shaft the customers or they will vote with their feet.
Yeah, I come across it regularly where accountants are involved in things they should be nowhere near, the result is usually a large short term saving which results in big bonuses all round but leaves a house of cards in the long term that ends up in ruins a year or two later costing an absolute fortune.
 
Yeah, I come across it regularly where accountants are involved in things they should be nowhere near, the result is usually a large short term saving which results in big bonuses all round but leaves a house of cards in the long term that ends up in ruins a year or two later costing an absolute fortune.
Yep. Nailed it in one Marvo.

I'm now off to do something that means much more to me these days.
Let my big fuzzy friend out and walk me.
 

Reply to 3 phase motor Question in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
438
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Hi James, At the inverter end the multi strand is ferruled and torqued in the terminal and at the motor end they are the “wago type” push fitting...
Replies
2
Views
386
  • Question
Here are the other drawings
    • Optimistic
    • Funny
Replies
6
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top