Good evening all.. I have recently installed a new 100amp 3 phase supply for a domestic premises with outhouses. The incoming 100 amp supply is PME and approx 30 metres from the main dwelling, a new metering cupboard was built for the new head and meter. I installed a small sub board and two 100amp switched fused isolators.
No 1: Switched fused isolators are feeding SWA submains supplying two parts of the main property
No 2: MCB's supplying small wooden out houses/sheds
Question I guess.... Should I have made the five outgoing SWA supplies TT's and supplied an earth spike at each distribution board, and RCD protection on each outgoing submains or just PME it?
The original supply going into the main house was PME 100amp single phase, none of the outgoing supplies to any of the out houses where TT, just SWA with exported earth.
No 1: Switched fused isolators are feeding SWA submains supplying two parts of the main property
No 2: MCB's supplying small wooden out houses/sheds
Question I guess.... Should I have made the five outgoing SWA supplies TT's and supplied an earth spike at each distribution board, and RCD protection on each outgoing submains or just PME it?
The original supply going into the main house was PME 100amp single phase, none of the outgoing supplies to any of the out houses where TT, just SWA with exported earth.
Last edited by a moderator: