Ok, so going back to your original post, the answer is: There is nothing in the regs to say that this supply is incorrect.
If you wish to go beyond the regs then that it up to you.
How about training people not to mess with things they shouldn't mess with??
Don't cover stuff like this in the Boil in the bag courses Spoon, so it will be difficult to do what you ask, nice thought though.
 
Ok, so going back to your original post, the answer is: There is nothing in the regs to say that this supply is incorrect.
If you wish to go beyond the regs then that it up to you.
How about training people not to mess with things they shouldn't mess with??
Thats the view I took from everyones responses. I have ordered a copy of the latest IEE wiring regs (I need an upto date copy anyway) I have already (whilst this thread has been on going) spoken to my boss about improving signage and additional training for all engineering types (IT and Broadcast) as well as operators who should ask before twiddling with things they know little about. I am most grateful to the quality and variation of the responses I have had on this site. It has been most helpful.
 
The risk is minimal, anyone who takes the lid of kit whilst 2x different phases is live is asking for trouble. The scenario could (not would) be if equipment power shares using 2x independent PSU's running from different phases. Even in this condition using switch mode psu's the effect is unlikely to cause a problem. But why take the risk, minimal as it maybe. In Broadcast and related systems (editing, post production houses etc) often other non engineering types have access to power connectivity (when they shouldn't) and this is where problems could arise. Maybe it is considered to be overkill and you could be right, but ( I use this word a lot) we take safety very seriously and make sure there is no likelihood of having mixed phases no matter that the problems of doing so is minimal, i say again, why take the risk when we dont need too.

Again you've said 'why take the risk' without describing what the risk is.

I agree that safety should be taken seriously, but overreacting to something and putting excessive signs and labels on equipment makes it more likely for people to ignore those signs or not see the ones that really are important.
 

Reply to 3 phase power in the Talk Electrician area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
285
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
787
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
810

Similar threads

Just stick the 63amp fused connector before the Henley block , or Lucy block as you call it, and your all good, as for your 2nd point, , the...
Replies
1
Views
996

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top