Hi all,
Background- I rent commercial premises for a small cabinetmaking business. Lots of 3 phase machines and 240v circuits. The site is on a farm where the main supply enters the landlords unit to a distribution board where it is then split to various rented units. That board looks like standard 3 phase board to me.
At my end I have an isolator, a meter then my distribution board which is 100A RCD protected.
The site has a good electrician maintaining it but my main concern is that my supply and earth comes from another unit which is not exactly tamper proof.
My worry is that someone poking around that primary board could compromise my earth and therefore my RCD protection - is this correct?
That unit does have a few 'old boys that know everything' and I'm sure people go to that board frequently to fiddle.
Sorry this is long winded but my question is should I consider this a concern for our workshop and should we be looking at installing our own earth rod or something to ensure earth at all times?
Background- I rent commercial premises for a small cabinetmaking business. Lots of 3 phase machines and 240v circuits. The site is on a farm where the main supply enters the landlords unit to a distribution board where it is then split to various rented units. That board looks like standard 3 phase board to me.
At my end I have an isolator, a meter then my distribution board which is 100A RCD protected.
The site has a good electrician maintaining it but my main concern is that my supply and earth comes from another unit which is not exactly tamper proof.
My worry is that someone poking around that primary board could compromise my earth and therefore my RCD protection - is this correct?
That unit does have a few 'old boys that know everything' and I'm sure people go to that board frequently to fiddle.
Sorry this is long winded but my question is should I consider this a concern for our workshop and should we be looking at installing our own earth rod or something to ensure earth at all times?