OP
iceman
i did mention to her to hav a 17th slit load board and rewire upstairs lights and heating supply but its all down to cost at the end of the day she said i cant realy afford lol she asked me if it was safe and i told her no cos theres a fault somewhere if thy dont get the work done wot can i do i cant hold em at gun point lol