Leeds Solar have just become aware that on 10th March DECC slipped in a Statutory Instrument that takes effect today (31st March 2016) that results in the following urgent issue.
[h=4]All existing renewable energy installations with an MCS certificate issued before 15th January 2016 must submit their Feed-In Tariff application by 31st March 2016 or they will never be able to claim any Feed-In Tariff or Export payments.[/h]We have produced a revised version of appropriate sections of the legislation including the new amendments at the bottom of this blog article, as well as a quick guide to the issue for those potentially affected.
[h=4]All existing renewable energy installations with an MCS certificate issued before 15th January 2016 must submit their Feed-In Tariff application by 31st March 2016 or they will never be able to claim any Feed-In Tariff or Export payments.[/h]We have produced a revised version of appropriate sections of the legislation including the new amendments at the bottom of this blog article, as well as a quick guide to the issue for those potentially affected.