31st March deadline for FIT applications for systems with MCS cert issued <16th Jan | on ElectriciansForums

Discuss 31st March deadline for FIT applications for systems with MCS cert issued <16th Jan in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Joined
Jan 20, 2012
Messages
4,210
Reaction score
1,133
Location
Leeds
Leeds Solar have just become aware that on 10th March DECC slipped in a Statutory Instrument that takes effect today (31st March 2016) that results in the following urgent issue.

[h=4]All existing renewable energy installations with an MCS certificate issued before 15th January 2016 must submit their Feed-In Tariff application by 31st March 2016 or they will never be able to claim any Feed-In Tariff or Export payments.[/h]We have produced a revised version of appropriate sections of the legislation including the new amendments at the bottom of this blog article, as well as a quick guide to the issue for those potentially affected.
 
Re: 31st March deadline for FIT applications for systems with MCS cert issued <16th J

innit.

Apparently STA mentioned this in a briefing about the original FIT cuts from December so it was obviously intended to have been part of that original legislation, but DECC just forgot to actually include it properly and then thought it was ok to just sneak it in via a new Statutory Instrument that nobody even knew about.

OFgem however hadn't put it in their guidance as far as I could see, presumably because their guidance was based on the legislation, not on stuff DECC had intended to do but forgot to actually draft into the legislation.

We work to Ofgem's guidance and the legislation, I did vaguely remember something about this from the STA document but as it wasn't mentioned by Ofgem and I couldn't see it in the legislation I'd assumed it hadn't been implemented.
 
Re: 31st March deadline for FIT applications for systems with MCS cert issued <16th J

Forgive me being lazy, but have you spotted anything similar for domestic or non-domestic rhi?
 
Re: 31st March deadline for FIT applications for systems with MCS cert issued <16th J

I've not looked, we've done that little of it in recent years.
 

Reply to 31st March deadline for FIT applications for systems with MCS cert issued <16th Jan in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
410
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top