M
MikeB
GN3 clearly says load to be disconnected.
40ms rcds are rated at 40ms to limit touch voltages from rising above 50 in the event of a fault- as I understand it.
200ms and 300ms rcds won't do this.
40ms rcds are rated at 40ms to limit touch voltages from rising above 50 in the event of a fault- as I understand it.
200ms and 300ms rcds won't do this.