T
tomy98989898
Hi everyone, im new in the electrical field.
the scenario is someone asked me to reconnect main ins a RCD wires. but he asked for certificate for that.
I only reconnected to wires. I did take Ze,Zs for 2 breakers after the RCD, RCD tests, Main Bonding, Main cutout, earth arrangement details, but Q is: is there anything else needed to test? or what else needed to be done?
Thanks for helping
the scenario is someone asked me to reconnect main ins a RCD wires. but he asked for certificate for that.
I only reconnected to wires. I did take Ze,Zs for 2 breakers after the RCD, RCD tests, Main Bonding, Main cutout, earth arrangement details, but Q is: is there anything else needed to test? or what else needed to be done?
Thanks for helping