OP
claret73
How would this be done in a practical sense? Taking the example of 3 flats and each flat had Gas & Water, would you terminate 6x Bonding conductors back to a Multiple earth block at the Intake and feed your 16mm MET to the Main CU from that also?
Just done a testing exam at College & the sub board was protected at the Main CU by an RCBO. The Sub CU had MCB's no RCD Protection. I would think in a situation of the flat's CU it would require RCD Protection under current Regs...
Just done a testing exam at College & the sub board was protected at the Main CU by an RCBO. The Sub CU had MCB's no RCD Protection. I would think in a situation of the flat's CU it would require RCD Protection under current Regs...