Adjusting tripping time.

Hi all,

Curious one and hopefully some one of you could give me some advice.

A customer has had a steeltech shed installed at their premises. A large one. Wants 3x light fittings and 5 double sockets intalled. There's an electric roller shutter door on the shed also to be plugged in. My plan was to run a 6sq cable out from house DB, and put a little enclosure in shed with rcbos for lights and sockets, all backed up by a 32 or 40A mcb at house DB.

Customer stated that because the electric roller shutter is the only means of accessing the shed, that in the event of a power failure he'd have to smash a window to get into shed to open the shutter manually from the inside. And so he's requesting if there's any way the power in the house DB would trip first rather than the shed DB in event of power failure to shed. Hope this makes sense.

Any advice would be much appreciated in how to approach this
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Back
Top