Hi guys I wanted abit of advice on the best way to electrically isolate a supply when you don’t have the correct lock offs for the device i.e withdraw-able fuses (I know you can get lock outs for these but was wondering what could be done if these aren't available). I guess I’m just asking about best practice as I’ve worked in equipment where they’ve said they’ve isolated a motor circuit but have only pulled the fuses.

Thanks for your help guys.
 
Removing fuses is an effective way of isolating a circuit.
If the door can be secured or locked closed to prevent someone inserting replacements then it could be deemed to be locked off.
It depends on the type of enclosure as to if this is suitable.
 
Also worth sticking up a warning label about being isolated for safety and with your contact info / mobile number. Won't stop an absolute moron but will make anyone else think and check before assuming the job has been done/forgotten about.
 
Removing fuses is an effective way of isolating a circuit.
If the door can be secured or locked closed to prevent someone inserting replacements then it could be deemed to be locked off.
It depends on the type of enclosure as to if this is suitable.
The door cannot be locked but the isolator hands can be locked off but that’s not stopping someone still getting in the panel
 
If you can lock and tag the isolator then normally that would be considered enough for safe isolation.
Do you have unusual risks on site because I am struggling to understand the problem
 
If you can lock and tag the isolator then normally that would be considered enough for safe isolation.
Do you have unusual risks on site because I am struggling to understand the problem
No we just have supervisors which pick up on everything so wanted guidance really on what the electricity at work act state as an acceptable isolation I know the isolator would be locked but still won’t stop people going in the panel and accessing electrical equipment
 
We use POI tape and the fuses/links are either locked in key safe or issued to the safety documents holder where necessary.


But that can only done where locking off is not reasonable practical.


As with all things this isn't official H&S advice and I would be speaking to your work H&S/legal for there stance/risk assessment.
[automerge]1598824631[/automerge]
But that can only done where locking off is not reasonable practical.

Forgot to mention that any neighbouring combatable fuses/link also need to be controlled
 
Last edited:

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
London
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Other
If other, please explain
Maintenance Electrician

Thread Information

Title
Advice on locking off and isolation
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
7
Unsolved
--

Advert

Thread statistics

Created
Jako13!,
Last reply from
StephenRowley,
Replies
7
Views
1,410

Advert

Back
Top