Hi,
I am changing a CU and all the previous CU changes I've done have been obvious what to do regarding cable runs.
I have attached a pic that shows the current CU and its clipped T & E's, the problem I've got is the client wants a few more new circuits and i will need to install a further 7 T&E cables that will follow the same route as the others.
I originally thought some 50x50/50 x 100 trunking to tidy them up but there is hot water pipe running vertically in the way
Has anybody got any ideas and how they would do this or some ideas to think about?
Thanks
I am changing a CU and all the previous CU changes I've done have been obvious what to do regarding cable runs.
I have attached a pic that shows the current CU and its clipped T & E's, the problem I've got is the client wants a few more new circuits and i will need to install a further 7 T&E cables that will follow the same route as the others.
I originally thought some 50x50/50 x 100 trunking to tidy them up but there is hot water pipe running vertically in the way
Has anybody got any ideas and how they would do this or some ideas to think about?
Thanks