Hi Gents

I do commercial work in my factory daily which is never a problem.
I mainly connect up 3 phase machinery and run extra power for new areas as well as maintain older installations.

All my machinery has data plates.

I have a job to do on Monday where we are installing a 2nd hand painting booth which is ventilated and heated as a separate cell.
I can find no data plates on it at all so I don't know what it pulls, the only clue I have is that they have left the old cable inside the panel which is 3 phase 4mm cable.
There are also 3 breakers rated at 10A inside the booth panel which I would think are the motors for the extract/heat.

I hate assuming but I have 6mm and 10mm SWA in my workshop so I may just bang in some 10mm (I don't pay for it!!) - ramp it up to full heat/speed and measure with a ring meter the Amp draw per phase.

Honestly I have looked everywhere for a plate and cannot see one - even the motor is fully enclosed and riveted hidden.

Can anyone add to aid me? or am I correct in my plan?

Many Thanks
 
Last edited by a moderator:
It seems you dont have the overcurrent for the loads to have to concern yourself with

If the supply cable is adequately protected for its ccc then your plan looks sound




What I would like to ask is in regard to you mentioning the location of the mcbs "in the paint booth"

If its an explosive area,the electrical equipment may have to be flameproof in order to be located in the booth itself and possible restrictions or zoning externally and you may have to have a permit to work on that equipment

I am looking at your question from a mining industry perspective only
icon7.png



 
We have a large painting/spraying booth at our depot.
As Des 56 has said, the location of the MCB's could be in an explosive atmosphere. The control panel we have at our site is outside the spray/painting area. The panel controls the heating and ventilation by switches on the door. All electricial connections are internal to this panel where access is only via a special key.
 

Reply to Advice Please in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Hi everyone, If you are looking for reliable EV chargers, check out our top-rated selection at E2GO! ⚡ Please note that all EV Chargers and...
Replies
0
Views
191
  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
1K
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K

Similar threads

C
  • Article
Small rental portfolio advice please. With the up and coming Renters Charter, its probably time to start thinking about increasing the efficiency...
Replies
0
Views
131
Chris Taylor
C
You’d have to change the size but you could just fit an LED panel behind the Perspex or whatever it is you’re using for the opaque top. Sizes of...
Replies
1
Views
270

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top