C
CCob
Hi,
I am currently getting quotes together from various sparks that are Part P compliant for wiring up a new outdoor CU to power a 43A tub.
For those that are in the know what installation method would be preferred/advised?
a. New SWA cable run from meter around the house to new CU? What size cable 16mm or 25mm?
or
b. Take feed from existing CU MCB to feed secondary CU unit
or
c. Any other options.
Thanks
I am currently getting quotes together from various sparks that are Part P compliant for wiring up a new outdoor CU to power a 43A tub.
For those that are in the know what installation method would be preferred/advised?
a. New SWA cable run from meter around the house to new CU? What size cable 16mm or 25mm?
or
b. Take feed from existing CU MCB to feed secondary CU unit
or
c. Any other options.
Thanks