Hello!
We hired an electrician in August to complete some work for us in a little art studio. It included metal conduit, plugs changing to metal ones (plus more added), pendant lights fitted, strip lights updating (2), plus bits like electrical radiators (3) and a hand dryer installed.
The work was due to be completed for the 9th of September, in time for the space to be used the following week. We were asked to pay for materials up front as he didn't like the idea of buying them, so we transferred ÂŁ1400 up front.
He then failed to show for two weeks, and gave us a few different excuses, then turned up in dribs and drabs (two hours here, then a full day on a random Sunday). We're now over a month behind schedule, paying rent on two places, and the work is still not completed. He never turns up. He never calls. We are constantly chasing him. Half of our unit is without lighting or power completely, including the toilet, which means the space as a whole is completely unusable. He has had to redo a few different bits where he has not followed our plan (pendants in the wrong places, power too close to the sink etc).
Anyway, he is now asking for payment before he completes. He's charging us for his mistakes and calling them our changes. He's threatening us with a bill for over ÂŁ4000 +VAT when I've asked for his break down of work completed, plus a receipt for the materials we purchased. He's incredibly defensive, aggressive and unprofessional, but I have no idea where we go from here. The work is uncompleted, he is demanding payment, but we have no faith he will even return if we pay him for the work done. We have never undertaken work to this scale, and basically do not know where to go from here. Where do we stand? Do we have to pay him immediately, or is it ok to request that work is completed first? He is claiming over 80 hours work on site, but this is just absolutely not true.
Furthering this, in reality, we do not want him on site any more. He has been so aggressive in his correspondence that we would really rather just pay him for work already completed and move on from this mess. Is that viable? We have no idea what to do.
Any help would be massively appreciated!
We hired an electrician in August to complete some work for us in a little art studio. It included metal conduit, plugs changing to metal ones (plus more added), pendant lights fitted, strip lights updating (2), plus bits like electrical radiators (3) and a hand dryer installed.
The work was due to be completed for the 9th of September, in time for the space to be used the following week. We were asked to pay for materials up front as he didn't like the idea of buying them, so we transferred ÂŁ1400 up front.
He then failed to show for two weeks, and gave us a few different excuses, then turned up in dribs and drabs (two hours here, then a full day on a random Sunday). We're now over a month behind schedule, paying rent on two places, and the work is still not completed. He never turns up. He never calls. We are constantly chasing him. Half of our unit is without lighting or power completely, including the toilet, which means the space as a whole is completely unusable. He has had to redo a few different bits where he has not followed our plan (pendants in the wrong places, power too close to the sink etc).
Anyway, he is now asking for payment before he completes. He's charging us for his mistakes and calling them our changes. He's threatening us with a bill for over ÂŁ4000 +VAT when I've asked for his break down of work completed, plus a receipt for the materials we purchased. He's incredibly defensive, aggressive and unprofessional, but I have no idea where we go from here. The work is uncompleted, he is demanding payment, but we have no faith he will even return if we pay him for the work done. We have never undertaken work to this scale, and basically do not know where to go from here. Where do we stand? Do we have to pay him immediately, or is it ok to request that work is completed first? He is claiming over 80 hours work on site, but this is just absolutely not true.
Furthering this, in reality, we do not want him on site any more. He has been so aggressive in his correspondence that we would really rather just pay him for work already completed and move on from this mess. Is that viable? We have no idea what to do.
Any help would be massively appreciated!