just got a call from a quote i did for a hot tub.
did not get the job by the way!
bit annoyed really, but it got me thinking!
Ok, new sub board req (rcd protected)from a new henley block where i would have split tails.
10 meters internal run 6mm, 25 metres external run with armoured, lift 16 slabs and bury cable, re-lay with sand all nice and even into rotary isolator in shed, back out 6 metres under 5 slabs, lift and re-lay to hot tub location.
Install bonding to gas and water as non existant, 50 metres in total, pain to run in under kitchen units too, test, cert etc and guarentee for 1 yr.
ÂŁ450 all in including materials which were ÂŁ202.00!!!!!
so, am i too expensive or was she after a cheap one?!
thoughts please, and if so what would u have charged?
did not get the job by the way!
bit annoyed really, but it got me thinking!
Ok, new sub board req (rcd protected)from a new henley block where i would have split tails.
10 meters internal run 6mm, 25 metres external run with armoured, lift 16 slabs and bury cable, re-lay with sand all nice and even into rotary isolator in shed, back out 6 metres under 5 slabs, lift and re-lay to hot tub location.
Install bonding to gas and water as non existant, 50 metres in total, pain to run in under kitchen units too, test, cert etc and guarentee for 1 yr.
ÂŁ450 all in including materials which were ÂŁ202.00!!!!!
so, am i too expensive or was she after a cheap one?!
thoughts please, and if so what would u have charged?