Hello Guys
being a Londoner i have not had a great deal of experience with TT systems in a domestic setting.
The existing installation is in the basement, the existing earth rod is by the DB and sticking out of the ground, not inspection pit is that quite bad?
I was thinking of changing the rod and installing a pit, how long should the rod normally be to make sure i get a good reading.. on average?
all the final circuits will be 30ma RCD protected however with the DB being metal would i need to install a time delayed RCD before the DB?
being a Londoner i have not had a great deal of experience with TT systems in a domestic setting.
The existing installation is in the basement, the existing earth rod is by the DB and sticking out of the ground, not inspection pit is that quite bad?
I was thinking of changing the rod and installing a pit, how long should the rod normally be to make sure i get a good reading.. on average?
all the final circuits will be 30ma RCD protected however with the DB being metal would i need to install a time delayed RCD before the DB?
Last edited by a moderator: