Hi all,

Just deciding what option to go for, it's for a 3phase supply to a large house.
I'm taking a phase to each floor and i beleive i can either terminate into a isolator, and onto a busbar then connect each cable onto that and out to each DB (although isolation would be all or nothing in the future?)
or install a 3phase DB and run each DB off of it with a 63A MCB for each sub main. I guess the latter is probably the best domestic option but any ideas on the matter would be appreciated!

Thanks in advance
 
Last edited by a moderator:
or run a 3 phase to each floor and fit a small 3 phase board to each.

and one 3 phase at the intake with Triple pole MCB's to supply the submains. then you can run smaller CSA submain cables to each floor. ?

helps balance the loads better too imo ?
 
If it's domestic then surely you will have 3 meters (1 per phase). So can you not go from each meter tails to a 63amp switch fuse then sub mains to a CU on each floor?
 
Why wouldn't a domestic have a 3 phase meter ?
I assumed that as the loading would so unbalanced that there would be 3 separate meters is that not the case? Are modern meters better at unbalanced loads?
Only reason I suggested 3 meters for 3 phase domestic is that is what has been suggested to me for my property. While not strictly domestic (5 holiday apartments and 1 domestic in single victorian 3 story building) the loading will be unbalanced.

Just had a look at 3 phase meters. I did not realise that they new ones can just measure each phase KW usage and add up a total usage.
Thanks.
 
Last edited:
Best option would be to run a 16mm2 3 core cable SWA with single phase board to each floor protected by a 63a device from your 3 phase intake position board. Place each floor on a seperate phase/line. This should achieve reasonable balancing providing the load after applying diversity calculates to be roughly the same give or take between 2-5 amps per floor.
 
Best option would be to run a 16mm2 3 core cable SWA with single phase board to each floor protected by a 63a device from your 3 phase intake position board. Place each floor on a seperate phase/line. This should achieve reasonable balancing providing the load after applying diversity calculates to be roughly the same give or take between 2-5 amps per floor.


i would have thought running single phases to each floor could make things quite unbalanced.... say for instance.. L1 for the ground floor... kitchen, possible outbuildings all on the one phase.. the most current using equipment would be on one phase then..

i may be wrong ?
 
i would have thought running single phases to each floor could make things quite unbalanced.... say for instance.. L1 for the ground floor... kitchen, possible outbuildings all on the one phase.. the most current using equipment would be on one phase then..

i may be wrong ?
That's what I was thinking:
L1 - Ground floor lighting, outdoor lighting, garage lighting, oven, kettle, toaster, dishwasher, microwave, fridge, freezer, coffee machine, warming drawer, steam oven, washing machine, tumble drier, large TV, AV equipment, hotplate, central heating pump.
L2 - 1st floor lighting, clock radio, bedroom TV, hairdryer.
L3 - 2nd floor lighting and TV in rarely used guest bedrooms.

Doesn't seem as balanced as it could be.
 
That's what I was thinking:
L1 - Ground floor lighting, outdoor lighting, garage lighting, oven, kettle, toaster, dishwasher, microwave, fridge, freezer, coffee machine, warming drawer, steam oven, washing machine, tumble drier, large TV, AV equipment, hotplate, central heating pump.
L2 - 1st floor lighting, clock radio, bedroom TV, hairdryer.
L3 - 2nd floor lighting and TV in rarely used guest bedrooms.

Doesn't seem as balanced as it could be.

Very true
 
That's what I was thinking:
L1 - Ground floor lighting, outdoor lighting, garage lighting, oven, kettle, toaster, dishwasher, microwave, fridge, freezer, coffee machine, warming drawer, steam oven, washing machine, tumble drier, large TV, AV equipment, hotplate, central heating pump.
L2 - 1st floor lighting, clock radio, bedroom TV, hairdryer.
L3 - 2nd floor lighting and TV in rarely used guest bedrooms.

Doesn't seem as balanced as it could be.

TBH, with this list, do you even need 3ph anyway????? A premium billed expense when all you've got is probably coped with happily on an 80A single once you've done some diversity calcs.
 
Depends on the size of house.
It's when they want to start adding hot tubs or a swimming pool that your ****ed.

Best to over engineer than under engineer :)
 
Depends on the size of house.
It's when they want to start adding hot tubs or a swimming pool that your ****ed.

Best to over engineer than under engineer :)

to a point I agree with that - but only so far as not painting yourself into a foreseeable corner. You cannot future proof indefinitely, nor should we attempt to second guess what the needs of a customer may or may not be in five years time. If our forbears of this industry had future-proofed every installation for the next fifty years there'd be an awful lot more sparks with time on their hands now! If in the future someone decides to spend £30k or whatever to build a swimming pool, then the few hundred quid to reinstate the 3ph will form a part of that. And you, or some other spark, gets to do the job all over again. Ker-ching. In the meantime, 5 yrs of unnecessarily paying for a 3ph supply/standing charge and possibly whole-current metering will still probably be more than getting it installed when it's actually needed!
 

Reply to Best cost effective option? in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
152
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
509
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
457

Similar threads

  • Question
much more information required. Is the supply to the first building a DNO supply or a sub main cable from another building ? if it is a sub main...
Replies
5
Views
932
My guess is that you'll need to have your existing re-jigged as you've probably got a separate consumer unit fed from the time clock side of your...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top