Hi all,
I just joined this forum as I was embarking on few projects at home, and loved what I saw in the different threads!
I am in the process of adding a generator inlet box to my house and had a few questions. I'll start with one of them which is about running the 50A wire outside the home from the inlet box to the point of entry in to the house.
In my situation I'd like to run the generator at the back of the house. The most convenient place to get the power in to the house is near the power meter, which is on the side of the house. I have been deliberating between 2 options (attached pic for visual reference).
Option #1 - Having the inlet box right at the power meter and using a long power cord from the generator.
Option #2 - Having the inlet box also in the back of the house and run permanent line run to the point of entry in to the house near the power meter. Then use just a short power cord from the generator.
Is there a technically preferred difference between these 2 options?
If I am to do option 2, is it ok to run the conduit along the seam of the foundation wall and siding or should it be buried? The grade is about 2 ft below this level throughout, and I felt mounting the conduit on the foundation brick is fine. But, I will defer to the recommendation here.
~Ara
I just joined this forum as I was embarking on few projects at home, and loved what I saw in the different threads!
I am in the process of adding a generator inlet box to my house and had a few questions. I'll start with one of them which is about running the 50A wire outside the home from the inlet box to the point of entry in to the house.
In my situation I'd like to run the generator at the back of the house. The most convenient place to get the power in to the house is near the power meter, which is on the side of the house. I have been deliberating between 2 options (attached pic for visual reference).
Option #1 - Having the inlet box right at the power meter and using a long power cord from the generator.
Option #2 - Having the inlet box also in the back of the house and run permanent line run to the point of entry in to the house near the power meter. Then use just a short power cord from the generator.
Is there a technically preferred difference between these 2 options?
If I am to do option 2, is it ok to run the conduit along the seam of the foundation wall and siding or should it be buried? The grade is about 2 ft below this level throughout, and I felt mounting the conduit on the foundation brick is fine. But, I will defer to the recommendation here.
~Ara