ah right, so the bit about the EPC D requirement not applying only counts for the multi installation rate.medium rate applies:
- where owner has 25 or more installations and EPC 'D' is not a requirement or EPC 'D' is met
(10.1.a OR 10.1.b) AND (10.2)
- where owner has 25 or more installations and takes over ownership of a previously high rated install (12, 13)
I have just gained my DEA qualification so at least I can Do my own EPC's now !!!!
Or I may offer a service where I could do EPC & solar survey for other companies if required ?
I'm not sure if I've missed something but on P6 at the top it shows less than 4kwp installations installed before 3rd March @ 45.4p from April. There doesn't seem to be any caveat referring to the possibility of a lower rate if the Supreme Court case goes ahead and the gov't wins - have they decided not to persue it??
eye, eye -and then sell them a system at the same time :ciappa: