W

waitees

Hi

I have already posted a question this morning and had great response, i forgot to mention on an install that is ready for the niceic regarding where i stand on bonding. I understand that the water and gas have to be 600mm on the consumer side however must we check when fitting a new board that all the radiators, taps, pipes etc have a 0.05 reading and if not start pulling boards up and where there is plastic joints we have to install earth cable and straps ?

The reason i ask is that the 1st job for the niceic to check , the piping is mostly been replaced with plastic all over the house. At every rad if there is plastic under the boards but copper from the boards to the rad do we have to bond this small amount of exposed copper ?

any help would be great !!
 
If the radiator is clear fron any part of the electrical system then No need to bond.

As the pipes are insulators then you woukld have to link all radiators and thus including them into the electrical system for no reason.
 
All that is required is main bonding to incoming services.
Supplementary bonding between conductive parts in a bath/shower room and metallic pipes entering the bath/shower room will also be necessary unless the 3 conditions below are met
1.All circuits within a bath/shower room 30ma rcd protected.
2.a continuity readind <1667 ohms between extraneous and conductive parts
3.Required disconnection time met for all circuits within the bath/shower room

Nothing else is required.
 

Reply to Bonding for new CU in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
561
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
998
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
936

Similar threads

The power company only brings in 3 wires which is 2 live and 1 neutral wire. It’s our responsibility to add the ground rod to bond the neutral...
Replies
3
Views
697
  • Article
This is an RSS feed of thread: Hole in copper pipe, solder under floor, T coupling & protection Content of the thread: I was stupid enough not to...
Replies
0
Views
241

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top