W
waitees
Hi
I have already posted a question this morning and had great response, i forgot to mention on an install that is ready for the niceic regarding where i stand on bonding. I understand that the water and gas have to be 600mm on the consumer side however must we check when fitting a new board that all the radiators, taps, pipes etc have a 0.05 reading and if not start pulling boards up and where there is plastic joints we have to install earth cable and straps ?
The reason i ask is that the 1st job for the niceic to check , the piping is mostly been replaced with plastic all over the house. At every rad if there is plastic under the boards but copper from the boards to the rad do we have to bond this small amount of exposed copper ?
any help would be great !!
I have already posted a question this morning and had great response, i forgot to mention on an install that is ready for the niceic regarding where i stand on bonding. I understand that the water and gas have to be 600mm on the consumer side however must we check when fitting a new board that all the radiators, taps, pipes etc have a 0.05 reading and if not start pulling boards up and where there is plastic joints we have to install earth cable and straps ?
The reason i ask is that the 1st job for the niceic to check , the piping is mostly been replaced with plastic all over the house. At every rad if there is plastic under the boards but copper from the boards to the rad do we have to bond this small amount of exposed copper ?
any help would be great !!