W
wolfiehogan
hi, am carrying out work in a mushroom unit/house and am not sure how i bond the steel structure off the shed.i will try and explain the structure. there is 3 rows of steel poles running the length of the shed and cross beam connecting these the hole length of the shed. all these beams are connected together with steel clips. my problem is do i need to bond all off these beams or how to i go about bonding it. hope some body can help