Wow!

Bonding was an art form in the day. Curly swirls of pure waste of time.

I myself was apart of it, but I also knew then some things made no sense as you do today. We where the same as you are today.

To say No bonding is necessary is quite silly.

The big issue is what happens when your RCD fails or your RCBO no longer works. What is the next function to help?

I myself always get the basic bonds done and make sure the plumber on site gets me a 6inch Copper in the point of entry. Or whatever they are prepared to function for there pipe size wise.

If unlucky to not speak then you cant bond. Make a note.

Good luck.
 
No curly anymore. makes no sense. What if its not 22. when fail occurs. things change over time. thats what its all about the unexpected occurrence..
 
Wow!

Bonding was an art form in the day. Curly swirls of pure waste of time.

I myself was apart of it, but I also knew then some things made no sense as you do today. We where the same as you are today.

To say No bonding is necessary is quite silly.

The big issue is what happens when your RCD fails or your RCBO no longer works. What is the next function to help?

I myself always get the basic bonds done and make sure the plumber on site gets me a 6inch Copper in the point of entry. Or whatever they are prepared to function for there pipe size wise.

If unlucky to not speak then you cant bond. Make a note.

Good luck.

Don't see the point of adding the 6" piece of copper to a plastic water incomer.
 
perhaps it is to guard against Electromagnetic Effects?

It's to increase the chance of actually making contact through the power-coat. Personally I would like to see separate terminals drilled and tapped into the mounting flanges, or at the very least the coating removed and A2 star washers under the lugs, plus a strap to a bared section near the centre of the rail, coated in graphited grease to prevent corrosion.
 
I'm seeing a problem with electrician's here.

Why do we need a bond to any item. Lets get rid of all CPC its not needed for anything some nations don't use CPC. so why use it. RCD don't use CPC its a voltage difference.

Do we use it for testing only. Its a copper bit of cable to mean anything.

There is the 19th edition soon it maybe a cost saver.
 
Moose I'm not sure whether you're trying to wind us up here or not!
A circuit protective conductor is not a bonding conductor and serves a different purpose.
So even if the bonding to water and gas is not needed in a certain situation, the CPCs would still be absolutely an essential part of every circuit.
 
Actually ADS was formerly know as EEBADS. Earthed equipotential bonding, automatic disconnection of supply. 2 different but related systems.
The bonding is to ensure that all exposed and extraneous conductive parts will rise to the same voltage potential for the duration of an earth fault. ADS ensures that the fault will be disconnected automatically within a specified time.
I'm sure you know all this. Just not sure why you are questioning the way we do things.
Anyway, time for some beauty sleep methinks...
 

Reply to Bonding of Water pipes (plastic incomes) in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
183
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
560
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
516

Similar threads

  • Question
4-5 hours for 150? no chance, this is 2024, 150 for 2 hours maybe, that said an hour seems pretty quick, not sure he did the job right
2
Replies
23
Views
2K
  • Question
Any metalwork connected to the MET could rise in voltage compared to true earth under an open supply neutral fault (on TN-C-S), and that would...
2
Replies
24
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top