On one DB at the O2, there was so much slack, they had to cut the back out of another length of 6 by 6 trunking and fix it on top of the original length.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Bs en 61439-3 in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net
We have bird's nests around our way.
To be fair at times i have left a ball of cable in several 4 way cu's, due to the nature of our production processes our consume units are often relocated a foot this way or that way so out of laziness we would leave a lot of slack on circuits for retermination at a later date
I can’t believe you allow for moving a DB at the whim of production. “Get stuffed” always worked for me, they don’t ask again.
That said everything had to be in SWA and shifting a DB would result in major upheaval.
What sort of manufacturing are you in that needs things shifted at short notice. (No need for details but I’m curious why things would have to be moved)
Sounds like you need a consultant production engineer to rationalize the set up. It seems to be creating needless work.
the problem is you have to work to the spec or you dont get paid.OK it keeps you in work but I’d soon be tired of going back to alter the same thing time and again.
it wouldnt help ive got aspherges, it looked right when i typed it.Could I recommend the excellent book by Pedro Carolino, English As She is Spoke.