That board is obsolete so any new Memera/Eaton will not fit. The second hand market is the only place to obtain a Memera 2000 main rcd switch.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss C2 code for no RCDs? in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
One of the biggest issues with the way the new law was introduced was the limit of 28 days on rectifying C2s. At a time when all electricians were going to be busy, let alone during a lock down, it always meant there would be limited chance to shop around or get many alternatives, so leaving some landlords pressured to have expensive or overpriced work that may or may not be necessary.I have no problem with RCD protection. My issue is the need to correct C2s within 28 days and the high quote to change the whole board "urgently".
I'll take your advice about fitting an RCD main switch.