It looks like I am going to be the one that gets lumbered with a cable joint to do.
In a metre deep trench, in the rain, I'm going to have to joint an old PILC to a new 2 core 16mm2 SWA.
I've not had this particular pleasure before so I'm wondering if any of you guys could give me advice.
Thanks!
In a metre deep trench, in the rain, I'm going to have to joint an old PILC to a new 2 core 16mm2 SWA.
I've not had this particular pleasure before so I'm wondering if any of you guys could give me advice.
Thanks!