A new sub-main 3-phase supply to be installed on a large commercial site.....to supply a new food outlet (small building)
Sub main to be wired in SWA
Length of run 160 meters
Max load 65-70amps per phase (information supplied by catering company) no diversity has been applied by them.Also no allowance is required for any future expansion.
Not going to go into the full details.... but a disagreement exsits about the size of cable to use.
Would like to see what anyone on here would come up with.....
Sub main to be wired in SWA
Length of run 160 meters
Max load 65-70amps per phase (information supplied by catering company) no diversity has been applied by them.Also no allowance is required for any future expansion.
Not going to go into the full details.... but a disagreement exsits about the size of cable to use.
Would like to see what anyone on here would come up with.....