Hi all
question regarding installing cables on cable tray. Currently working in a restaurant down south and laying are installing twin and earth cables on cable tray. Quick and easy I suppose but is there a regulation what states the way you should tie the cables to cable tray. I have worked in a few different sizes of the industry but there is only 4 twin and earth cables getting run along to a another fuse board. Was thinking of tieing down 2 on top of the other two which makes it look neat but not sure if there is a ref that stops this method. Can’t see why there would be a issue have seen this loads of places but just wanted other fews ? Thanks in advance.
question regarding installing cables on cable tray. Currently working in a restaurant down south and laying are installing twin and earth cables on cable tray. Quick and easy I suppose but is there a regulation what states the way you should tie the cables to cable tray. I have worked in a few different sizes of the industry but there is only 4 twin and earth cables getting run along to a another fuse board. Was thinking of tieing down 2 on top of the other two which makes it look neat but not sure if there is a ref that stops this method. Can’t see why there would be a issue have seen this loads of places but just wanted other fews ? Thanks in advance.