T
The Ghost
- put in two ring circuits (18 D/so) and do dead tests, connect into consumer unit, do live tests
- A visual inspection of the lighting circuit with tests Dead and live and record loft with boxes and boarded (Lim) but some wiring in sight
- A risk assessement and method statement/Toolbox talk
- affix a box on the wall(C/U)
- chase out several chases
- liaise with the client
- Deliver materials on to site
- Remove two sockets in the way of new cct and spur This a terraced victorian house boards already up boxes on wall and chased for you.