Y
YoungScud
How stupid can the UK get. Surely 1 set of regs would be best.... no wonder the incomers get confused then don't give a txss!
That would require a unified legal system. Not going to happen.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Changing Consumer Unit in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net
How stupid can the UK get. Surely 1 set of regs would be best.... no wonder the incomers get confused then don't give a txss!
I haven't been involved in domestic as a rule but
Generally a competent spark would disconnect the tails from the Isco's , and carry out the consumer unit change without involving the NIE , as the demarcation line from the NIE is normally the tails going into the meter
I am currently planning on changing the Consumer Unit in the Boiler Room of my home. The board is 17 years old, fitted with old cartridge fuse holders. I am planning on upgrading to a new amendment 3 (bs7671 - 2015) standard. The problem I am having is that I have no experience of working Live, the incoming tails from the meter box have no means of isolation. They are connected into Black connector blocks just before the Consumer Unit and then doubled together in both connectors and are connected on til 2 80A RCD's. If I can get the tails safely isolated, I know how to do all the rest.
Can anybody here advise me on what my safest option would be to give me peace of mind?
not in my book. if all precautions to prevent injury are taken, there's no reason to hold a job up several days to wait for someone else to wander up and work live, same as you would do yourself....thus falling foul of EAWR Regulation 14.
not in my book. if all precautions to prevent injury are taken, there's no reason to hold a job up several days to wait for someone else to wander up and work live, same as you would do yourself.
not in my book. if all precautions to prevent injury are taken, there's no reason to hold a job up several days to wait for someone else to wander up and work live, same as you would do yourself.
How stupid can the UK get. Surely 1 set of regs would be best.... no wonder the incomers get confused then don't give a txss!
It's getting worse - I notice that AM3 OSG talks about the "Building Regulations of Wales" (OSG section 1.2.4) - "On 31 December 2011 the power to make building regulations for Wales was transferred to Welsh Ministers".
It says that the building regs for England and Wales continue to apply in Wales until Welsh Minsters make changes to them.
something about mating with sheep?That doesn't seem to make sense to you? What regulations should apply until Welsh ministers make changes to them?
That doesn't seem to make sense to you? What regulations should apply until Welsh ministers make changes to them?
Reply to Changing Consumer Unit in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net