Hi all.
I'm after some help and probably a quote. I posted a while ago but no response so hopefully this time I might get an answer or two.
I have a 4kw solar system running through a solax hybrid inverter into the house and I have a 48v lead acid battery bank (8Ă—6v leisure batteries) giving me 7kw usable storeage attached. Long story but I dont get a feed in tarrif so hate exporting to the grid. I did add a diverter to put any spare into the hot water tank but I still end up exporting in the summer. I would like to add a second battery bank such that when one is full, rather than exporting, a battery charge controller of some sort switches the charge to the second and maybe a third. Is such a thing possible, available and does anyone want to give me a price to install it. Im in Spalding, Lincs area.
I'm after some help and probably a quote. I posted a while ago but no response so hopefully this time I might get an answer or two.
I have a 4kw solar system running through a solax hybrid inverter into the house and I have a 48v lead acid battery bank (8Ă—6v leisure batteries) giving me 7kw usable storeage attached. Long story but I dont get a feed in tarrif so hate exporting to the grid. I did add a diverter to put any spare into the hot water tank but I still end up exporting in the summer. I would like to add a second battery bank such that when one is full, rather than exporting, a battery charge controller of some sort switches the charge to the second and maybe a third. Is such a thing possible, available and does anyone want to give me a price to install it. Im in Spalding, Lincs area.