Afternoon to the Forum. Appreciate other views. PIR security lights seem to
need 5 mins adjustment after the first night.How do other members think,
half hour for parts, hour to fit, then allocate another hour to drive over
after the customer's phonecall about didn't go off/ reflection from next
door's pond/ boiler flue etc. Thanks, Dean.
 
The set up of the sensor should be within the price you quote for intallation, even if that means doing it at the light level the customer wants it to go off at. End of the day the customer is paying for goods and services provided by you which imho equates to the sercurity light being fully functional to the customers requirements.

Little trick that an old sparky showed me. If you've got a pir sercurity light job booked in, on the night before take it out of the box and put a plug top flex to it in your back garden and set it up for the level of light you think is corret. Also set the timer to about one minuet. This can save you a load of time going up and down a ladder for what is a small proffit job. hope that helps.
 
Yes, outdoor PIR lights are a pain. You pretty much have to build the extra costs into the price. There's the call backs to sort out triggering issues and quite a significant chance that it'll fail within the first year and require replacement. If I'm supplying it, I'll often charge double the cost of the light as "materials".
 
When I work on PIRs I always charge a price which includes going back at a specified time where the customer wants the light to start working and stop working. Normally done on the way or way back from a job mind.

Only takes 5 minuets to adjust a PIR. The timer is always set up as soon as the installation is completed, usually put some tape over the light sensor or a black bag.
 
I had this same problem last week and it got me thinking. If we can manufactor and supply a sola powered calculator for ÂŁ1.99 in the shops, why cant they make a digital pir to replace what we have now?


Fare enough we may have to buy an extra peice of kit so we can plug into the light and set it up for lets say 60s and a lumin level of --- but whoever puts a product on the shelves like that, I would buy it.


And lets face it, its that time of year when people start thinking about o/s lights.
 
One other way to do it is
specify at the time of giving the quote that you will install the light and do approximate setting up but the final adjustment is down to the customer, stipulate that this is the cheapest option, they normally go for it and it saves you going back and forth.

problem solved!
 
This is why every quote I have given for external PIR lights I have never won.

My price always includes the costs for going back to adjust etc, but i'm always too expensive.

Now I know why other charge less. :tt1:
 
hello David, your and the other members' approach is the right one, not just for
PIRs but anything else that probably needs another visit for adjustment.With
more margin I don't mind going back.Thanks, Dean.
 
I usually show the customer the set-up dials on the base (when in reach) and give them a free 50p driver to adjust, i explain i can roughly set it up but may need a tweak regarding the time and dusk level.... i sometimes get a phonecall and i take them through it over the phone..... i tend to fit low level seperate PIR's to allow this but if job is local ill pay a curtesy visit.
Its this extra service that gets you a good name the minute you charge for a second set up you will start a slippery slope of customers bad mouthing your service.
I have never advertised and im on my 3rd year and as busy as ever and to be honest yes you may need to throw an extra few hours here an there but the good name and recommendations is worth alot more than the lost earnings.
 
If you think you can charge a client extra, after you've done the job, to go back and do a minor adjustment you need to rethink your strategy. Alternatively don't quote for such business.
 
I just done a high end kitchen install about 2k work still to finish, fitted LED recess fittings throughout kitchen and dining and last saturday i got a call saying they have lost all lighting on that floor so did the usual over the phone queries but couldn't fathom the fault so took a 2hrs roundtrip to discover one of the fittings had blown but also mcb had blown too and although had been reset wasn't energising circuit. It was a existing circuit and mcb to the house but i took it on the chin and said as a goodwill il wavour any callout charge but will just add the small cost to the bill of the replacement mcb, ive already had interest from a neighbour of theirs for some work.
You kinda get a 6sense of when its acceptable to start piling in the extra's and when to just accept its part of the nature of the job.
 
One other way to do it is
specify at the time of giving the quote that you will install the light and do approximate setting up but the final adjustment is down to the customer, stipulate that this is the cheapest option, they normally go for it and it saves you going back and forth.

problem solved!

I absolutely agree.
You are providing and installing an appliance. You do the necessary, test it works and give the customer the USER INSTRUCTIONS that detail the adjustments that the user can make to customise the PIR to do what he wants.
Job done.


You try calling SKY to come and customise the SKY+ box for you after they have installed it........
Whoops there goes another ÂŁ100.
 
Your a business man not a taxman, scrimping pennies for making adjustments to a PIR you set up does not make good business sense as i already said and you Sky man anology is a poor example ... if the sky dish is set up and you find you signal is bad they will return and correct for free they have a duty of care that the set-up is correct, customising the sky box to personel taste is not comparable example having said that most sky engineers will do a basic set up as part of the install if you ask and any issues you can call them and they will take you through it step by step over the phone if you are a technophobe, alot of people out there have trouble following what would be to us basic instructions and having the attitude that they have user instructions and wash your hands of it will only alienate a good proportion of the market and do you no favours for your business.
 
Last edited by a moderator:

Reply to charging for 5 mins return visit in the Talk Electrician area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
270
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
763
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
765

Similar threads

The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
577
When I was on the electric board We had a pair of pillocks connect a housing estate to a very large genset, the n lead was in two parts and not...
2
Replies
28
Views
4K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top