Morning fellas. I know from regular visits to this website that we have some rather intuitive Sparkie’s on here so I thought I’d join in the fun.
I’ve got a rather basic question to start with but also where some of you can hopefully show your tips and tricks.
Im currently working on a project, making pre fab elec cupboards. These cupboards only have 1 circuit on the fuse board, until this is added to on site. The circuit consists of 17 points, only 3 of which are sockets, the rest being switched fused spurs and only 7 of these have loads installed in the factory. I do all the dead tests at source but unfortunately I don’t do all the installation as there are 5 other “Sparkie’s” (use the term loosely) on site. It’s becoming rather a pain removing all the spur fronts to do my ring final test, fully and properly. Now I’m more than willing to accept that I am being dumb, which I’m sure a few of you will be more than willing to point out, but do you guys have any ideas as to short cuts I could use to make the whole process a lot quicker?
Any ideas, opinions, legal short cuts welcome.
Thanks fellas.
This is my first post as well so hopefully it’s not too brutal an introduction. cheers boys!
I’ve got a rather basic question to start with but also where some of you can hopefully show your tips and tricks.
Im currently working on a project, making pre fab elec cupboards. These cupboards only have 1 circuit on the fuse board, until this is added to on site. The circuit consists of 17 points, only 3 of which are sockets, the rest being switched fused spurs and only 7 of these have loads installed in the factory. I do all the dead tests at source but unfortunately I don’t do all the installation as there are 5 other “Sparkie’s” (use the term loosely) on site. It’s becoming rather a pain removing all the spur fronts to do my ring final test, fully and properly. Now I’m more than willing to accept that I am being dumb, which I’m sure a few of you will be more than willing to point out, but do you guys have any ideas as to short cuts I could use to make the whole process a lot quicker?
Any ideas, opinions, legal short cuts welcome.
Thanks fellas.
This is my first post as well so hopefully it’s not too brutal an introduction. cheers boys!