• Please use style selector to select BLUE AND WHITE. If you are not already on it. This notice will go once you're on the correct style.

combi boiler

but look at the amount of energy that's wasted installing solar panels.. scaffolders time and energy + wagon fuel. roofers ditto, sparks ditto. all the energy utilised by the suits in their plush, warm, well lit offices writing the rules and processing the FIT tariffs. need i go on?
 
but look at the amount of energy that's wasted installing solar panels.. scaffolders time and energy + wagon fuel. roofers ditto, sparks ditto. all the energy utilised by the suits in their plush, warm, well lit offices writing the rules and processing the FIT tariffs. need i go on?

Exactly!!
 
It can be a problem if you run the entire length in overflow pipe which is about 22mm diameter. That's generally the size of the pipe that exits the boiler, but the "better educated" amongst us will immediately connect that into a 32mm - or even a 40mm - once it gets outside the building.


Run it in a downward direction as near to vertical as possible and tip it into a soil stack using a strap-on boss ... Ohh Missus!!!

I have never known one to freeze yet.

must be the fumes from your curry dumps transferred into the soil pipe keep the condensate pipe warm.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Back
Top