Sorry for the bad spelling, engineered should read energised, darn spell checks.Are you saying that this is going to be left like this and covered over? if yes then it is obviously non compliant, if however it is left like this not engineered, locked off until the plastering has been done, so all OK. One point though that cable doesn't look like 2.5mm2m why because one of those cpcs looks suspiciously like it#s yellow and not G/Y Just saying.