Hi. Hoping someone who works on this type of stuff all the time can help clarify things for me.
There's a small shop/office that's in need of a new CU.
Nothing complicated or fancy, few 32a ring finals, few 6a lighting and a 16a radial for an electric shutter.
Am I right in understanding that as it's commercial it's completely outside the scope of part p and building control?
There is a flat above, but they have their own cut-out from the DNO - does that change anything. When I tried to check the rules on this with local building control they seemed like they didn't want to know.
In which case the considerations would be to ensure the work:
- Complies with the Electricity at Work regulations
- Is all OK with the building insurance people (full testing cert etc.)
Is there anything else to consider? Any other notification or approvals needed?
Thanks for any advice on this.
There's a small shop/office that's in need of a new CU.
Nothing complicated or fancy, few 32a ring finals, few 6a lighting and a 16a radial for an electric shutter.
Am I right in understanding that as it's commercial it's completely outside the scope of part p and building control?
There is a flat above, but they have their own cut-out from the DNO - does that change anything. When I tried to check the rules on this with local building control they seemed like they didn't want to know.
In which case the considerations would be to ensure the work:
- Complies with the Electricity at Work regulations
- Is all OK with the building insurance people (full testing cert etc.)
Is there anything else to consider? Any other notification or approvals needed?
Thanks for any advice on this.