bit of reassurance on coding
I have 3 phase 3x150a (checked with supplier) incomer feeding meter in 50mm tails- 5omm tails to 3x blocks from meter
from each block tails to various isolators all not exceeding 1m in the same cupboard, the highest fused isolator at 60a being fed with 16mm and other various isolators around 32a -60a
anyway Im judging between c3 or c2 as the demand can't exceed 60a just after your thoughts