Have a cafe job to price this week, il get look tomorrow maybe.. 2000 sq ft..
I don't think he is going to go with steel pipe so nearly all my circuits is going to need rcd protection . I know there's roughly going to be 5-6 3 phase machines , and maybe 16 single phase circuits
im going to install 2x 8 way 3phase boards side by side , one board for 3 phase equipment with and up front rcd . The second board = 24 ways using Rcbos for single phase final circuits .
Does this sound the way Togo , il listen to how you would do it. Thx
big length of trunking straight down one side
I don't think he is going to go with steel pipe so nearly all my circuits is going to need rcd protection . I know there's roughly going to be 5-6 3 phase machines , and maybe 16 single phase circuits
im going to install 2x 8 way 3phase boards side by side , one board for 3 phase equipment with and up front rcd . The second board = 24 ways using Rcbos for single phase final circuits .
Does this sound the way Togo , il listen to how you would do it. Thx
big length of trunking straight down one side
Last edited: