Hi Folks

I'm used to (and understand reasonably well) simple dual tariff arrangements with two main switches (either two separate consumer units or a duplex). But I occasionally come across, and am now quoting for changing consumer units for a more complex arrangement that I don't full understand. There are four main switches, one for regular 24 hour loads (light, sockets, etc.), one for 24 hour heating, one for off-peak space heating, and one for off-peak water heating. I've seen this type of arrangement in a single duplex consumer unit, four separate consumer units, or two consumer units (one with all heating loads, one with just the 24 hour non-heating loads). So my questions are:

1. Why are the 24 hour heating and non-heating loads separate?

2. Why is the off-peak water heating load separate from the off-peak space-heating loads?

3. Is there any reason not to combine the loads onto two main switches, one with all 24 hour loads and one with all off-peak loads?

P.S. I can't remember the exact setup with the meters, but as far as I can remember, there were separate live tails to each main switch, each fed from different meter terminals, i.e. none of the main switches were fed from the same live meter terminals via a Henley block.
 
I came across this set up the other day, so it’s not just a north of Scotland thing. (I’m south Scotland) and I do remember them being popular in the 90’s.
Scottish Power thing only I believe, and other suppliers don’t offer the same set up.

The one I saw was a MEM double row board with lighting and power on top, and the 3 heater circuits below.
Beware of borrowed neutrals in the heating side. Mine had storage heater points that had been moved to the 24hr heating side for replacements with electric radiators... but they had only moved the live conductors, not the neutrals.
3 neutral bars off the 3 mainswitches.
Works fine until one of the main switches is turned off.... then the neutral of the swapped over circuit doesn’t have a return path except through my finger!!

(Details changed for dramatic intent. Safe isolation procedures were followed, and N-E showed 240v.... no fingers were harmed in the making of this post)
 
So its a little more common than you think.
Maybe other suppliers tried the same idea??
Did the suppliers not think at the time that people would use the cheap daytime heating tariff for a s
Its not too complicated if you can follow the spaghetti of cables inside the board.
 

Reply to Complicated dual tariff arrangement with four main switches. in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
307
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
828
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
924

Similar threads

If two tariffs are sufficient, and you don't need too many ways, you can easily add an SPD kit to the Fusebox F2014DT dual tariff board. The only...
Replies
1
Views
304
What makes it a lack of space? I’d say to the customer to dismantle a cupboard or whatever to creat the space you need for the extra equipment...
Replies
1
Views
223

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top