OP
GT1
Well as ever. The plan changed. !
Channel has been cut in the floor ready for electric under tile heating going over the top of my cable.
The floor max temp is only 30 deg c so I see no reason not use standard flat twin and earth. (derated capacity).
Anyone had a similar job ?
Channel has been cut in the floor ready for electric under tile heating going over the top of my cable.
The floor max temp is only 30 deg c so I see no reason not use standard flat twin and earth. (derated capacity).
Anyone had a similar job ?