Connecting a Sunhouse SSHE070 storage heater | on ElectriciansForums

Discuss Connecting a Sunhouse SSHE070 storage heater in the UK Electrical Forum area at ElectriciansForums.net

Joined
Feb 15, 2023
Messages
5
Reaction score
1
Location
Cardiff
Hi,
My electrician removed an old Creda storage heater connected to only 1 off peak supply and installed the SSHE070 but as the power is off peak he cannot set it up.
He connected it up but it has not come on over the off peak period.
Has he missed something?
He asked me to contact Dimplex but no phone number and the online "ticket submission" is no good.
Please can anyone help with this issue I have.
Thanks.
 
Yes your electrician has missed the fact this heater needs a permanent mains supply as well as the off peak supply
The instructions say:
[ElectriciansForums.net] Connecting a Sunhouse SSHE070 storage heater
You need the electrician back to connect it correctly!
 
Yes your electrician has missed the fact this heater needs a permanent mains supply as well as the off peak supply
The instructions say:
View attachment 106169
You need the electrician back to connect it correctly!
Thanks very much for your reply.
I will let him know and hopefully he can run a new constant supply.
Thanks.
 
Hi,
Does it then switch automatically to off peak when the time is right?
Thanks
The on-peak supply probably feeds a timer/control unit and a fan. The off peak supply will power the heating elements, but I suspect the on-peak is needed for the control unit to work, which seems to be borne out by your experience that it doesn't do anything with just the off-peak connected. I'll see what info there is on this.....
 
The on-peak supply probably feeds a timer/control unit and a fan. The off peak supply will power the heating elements, but I suspect the on-peak is needed for the control unit to work, which seems to be borne out by your experience that it doesn't do anything with just the off-peak connected. I'll see what info there is on this.....
Thanks for all your help, I have passed on all to my electrician.
Thanks.
 
Last edited:
You might want to read up on the operation of the controller if you haven't already!

I couldn't immediately see any definitive statement about on-peak power being necessary for it to work, but given the circuit block diagram at the back showing the heating elements apparently controlled through the pcb, I suspect you do need both supplies.
Just been looking around for a customer and I can't find any traditional restricted-supply only NSHs available to buy new, they all seem to need 2 supplies. Makes you wonder why they couldn't have a single unrestricted-supply and some kind of wireless signal when the off peak kicks in.?
 
I have had this recently
You need to have the heater on the 24h supply and then get the switching times for off peak from the supplier- as well as ask them if the switch times stay on GMT or change by an hour in the summer

Good luck getting this from your electricity supplier- I would also ask them to send you it in writing

You then need to enter thesem details in the the relevant setting on the heater and hope it works OK, otherwise the heater will not work / the client gets a massive bill due to incorrect switching times
 
I have had this recently
You need to have the heater on the 24h supply and then get the switching times for off peak from the supplier- as well as ask them if the switch times stay on GMT or change by an hour in the summer

Good luck getting this from your electricity supplier- I would also ask them to send you it in writing

You then need to enter thesem details in the the relevant setting on the heater and hope it works OK, otherwise the heater will not work / the client gets a massive bill due to incorrect switching times
I was thinking you could make something up with a wireless transmitter fired by the off peak supply coming on then a receiver switch on each heater with a contactor or SSR to supply the storage part of the heater, would be clunky though and probably unsightly, unless you figured a way to build the extra components into the heater case somehow...
 
The 24 hour supply doesn't have to be a separate circuit. If there's a socket nearby, it may be possible to spur from it.
All of the the storage heaters I've fitted recently need two supplies due to the need for compliance with the Lot20 directive.
Some can be run on just a 24 hour supply, but as baldy says, it can be tricky to set it up properly.
 
The 24 hour supply doesn't have to be a separate circuit. If there's a socket nearby, it may be possible to spur from it.
All of the the storage heaters I've fitted recently need two supplies due to the need for compliance with the Lot20 directive.
Some can be run on just a 24 hour supply, but as baldy says, it can be tricky to set it up properly.
Thanks for your reply, I will pass on to my electrician.
 

Reply to Connecting a Sunhouse SSHE070 storage heater in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
361
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
917
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

From the front cover of the manual: Newlec Helpline: 0800 783 6909 https://www.manualslib.com/manual/3408290/Newlec-Nlsh050.html#manual I think...
Replies
1
Views
231
Yet another update: I believe what EDF have done is moved me from an Economy 9 to an Economy 7. I've just emailed them to ask if they can switch...
Replies
2
Views
263

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top