T
TPES
Just got on with a company that do conservatories.
They have been using a sparky in the past but now got rid..
I think up untill today the original spark has not been complying to the regs much..
the reason im thinking this is because of the things the builders telling me and the price they were paying the original sparky per build.
What would you say is a minimum must when pricing up for a conservatory when complying with regs?
The obvious is RCD protect all circuits fed to conservatory..
Is it the same set of rules for going back to the board (EIC) as it is for the (MWC) adding to an existing circuit?
The reason i say this is that ive read that if theres only 6mm Main bonding then your still ok to continue with Minor Works or does every EIC or MW Cert issued have to have had bonding upgraded to 10mm
I just want to make sure i price for everything and not miss a thing.. on both scenarios of adding to existing circuit and a new circuit installed.
They have been using a sparky in the past but now got rid..
I think up untill today the original spark has not been complying to the regs much..
the reason im thinking this is because of the things the builders telling me and the price they were paying the original sparky per build.
What would you say is a minimum must when pricing up for a conservatory when complying with regs?
The obvious is RCD protect all circuits fed to conservatory..
Is it the same set of rules for going back to the board (EIC) as it is for the (MWC) adding to an existing circuit?
The reason i say this is that ive read that if theres only 6mm Main bonding then your still ok to continue with Minor Works or does every EIC or MW Cert issued have to have had bonding upgraded to 10mm
I just want to make sure i price for everything and not miss a thing.. on both scenarios of adding to existing circuit and a new circuit installed.