hi iv recently added to my kitchen ring for 2 new double skts in my new conservatory, have crimped the connections in behind the fast fix box, as i believe this is the correct way to do it rather than a junction box??!
im basically looking for info on what paperwork i need from a spark to get it signed off?
also looking to find out a rough cost of what this should be??
im in scotland so i should imagine prices will differ from the likes of london etc