I also seem to recall, quite a lengthy lead time to build the thing as well. Probably attractive for Wylex if you want several, but not if you just want one. Think I was quoted several weeks.
They are hard to source and are often built to order, been lucky on the last two as I have just Googled the rather lengthy part number and come up trumps with a wholesaler who has one.
 
I just spoke with the customer.

The off peak has only 1 circuit. There are 3 circuits on the off peak side of the board but 2 of them are unused as the storage heaters have been removed from the properly. It's just the water heater that's connected to off peak.

Is adding a second board for the off peak an option (local holesalers don't have dual tarrif)

I undestand modifying a split load board is not to spec but this would also work?
 
With only the water heater on cheap rate, shouldn't the first thing that you do be to look at previous bills and make sure that having the off peak supply is in the customers interest?
 
Have they considered their daytime tariff as it usually quite expensive. And economy 7 is not economy below 4kw usage of night time heating/usage due to the day tariff. I think Mhar beat me to it.
 
Thanks guys.

I have emailed customer regards the unnecessary need for dual tarrif and await his reply.

If he agrees to revert to a standard tariff will it be a DNO visit or will they change the tariff electronically and I make safe the second set out tails?
 
If the customer wants to keep the dual tarrif.

Can I use a split load board for on peak, then add second smaller board for off peak with the storage heaters.?
 
Thanks Richard,

I've read also a few people buying the larger split load boards, 15 & 21 way as these have 3 neutral bars then adding main switch for off peak side.

I'm going with the 2nd board option, mainly as the job needs doing and I can't wait for dual tariff board to arrive, checked wholesalers and none of them stock.
 
just fit a normal board, dual rcb or rcbos whatever you fancy, and fit a timer on the immersion as the others have said, go din rail mounted if you like, stick the un needed tail in a block? At least then you also have 1 point of isolation for the whole house which is always nicer
 
Adding a timeswitch is not a sensible option, it will end up out of sync with the off-peak times and just add an unnecessary point of potential failure.
There is already a switched supply present which is only live during the off peak charging period so use it.
 
Use a wylex rec4 (not the tp&n one but the one correctly labelled for economy 7) external to the new cu, and virtually any high integrity board with enough ways. All day supply as normal, overnight goes to new (second) main switch and feeds an rcbo which utilises the seperate n bar in high integrity units.
Something like 16 Way Metal Dual Split Consumer Unit c/w 2 x RCD's c/w 12 MCB's - https://www.tlc-direct.co.uk/Products/BGDP18616.html will give you 10 split load day circuits plus 4 overnight rcbos (or different combinations) with no alteration to the manufacturers product, utilises the supplied conductors and busbar and complies with single point of isolation requirements
 
Quick update.

Went to the job last night.

I am Limited with space for the size of the CU.

I have spoken with the customer and it is likely that a 12way (10mcb) CU will be installed with one side RCBOs for on peak, the second side Off Peak, Main switch / RCD / MCB setup.

This isn't the cheapest option, but it keeps each side on a main switch and RCD protected.

Sound OK?
 

Reply to Consumer unit change, economy 7 in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
551
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
991
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
922

Similar threads

This was posted this week, on topic ....... https://niceic.com/newsletter/omission-of-overload-protection/?dm_i=7G1W,7GCE,K4L2A,WHET,1
Replies
8
Views
931
Yet another update: I believe what EDF have done is moved me from an Economy 9 to an Economy 7. I've just emailed them to ask if they can switch...
Replies
2
Views
371

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top