S
s1m0n
Hi,
I need some clarification,
When changing a consumer unit only,
the forms to be filled in are electrical installation certificate, schedule of test results, and schedule of inspections,
my question is on the Schedule of inspection - that will only be with regards to the consumer unit installation its self, rather than any other part of the existing installation,
I will be doing a PIR before hand on the house,
thanks in advance
I need some clarification,
When changing a consumer unit only,
the forms to be filled in are electrical installation certificate, schedule of test results, and schedule of inspections,
my question is on the Schedule of inspection - that will only be with regards to the consumer unit installation its self, rather than any other part of the existing installation,
I will be doing a PIR before hand on the house,
thanks in advance